欧预赛赛程|网球直播捷报网|彩客即时比分完整比分直播|球探比分球探即时比分篮球,球探手机版,007球探即时比分足球世界杯,90ko极速比分即时足球比分手机版

<form id="lns4m"><tbody id="lns4m"><abbr id="lns4m"></abbr></tbody></form>
<i id="lns4m"><input id="lns4m"></input></i>
  • <span id="lns4m"><thead id="lns4m"><optgroup id="lns4m"></optgroup></thead></span>
      •   Homepage      Favorite      中文版
        Home About Us News info Products Services Recruitment Contact us
        SERVICES
        Marketing
        After Services
        Question
        Downloads
        CONTACT US
        Headquarter: No. 18, Yangguang Road, Xinyang Industrial Area, Haicang, Xiamen, P.R.China 361022
        Tel: +86-592-6539999
        E-mail: bussiness@xmzzj.com

        Question
        Location:Home → Services → Question
        Loader after inspection and maintenance work
        Public date:2015-1-21   Hits:21575

        After work each day to check:

        1) Check the fuel reserves.
        2) Check the engine oil sump and clean the case, if found too high and thinning the oil, should find out the cause and be excluded.
        3) Check the tubing, pipes, pipe and various accessories for leakage.
        4) Check the transmission, torque converter, hydraulic pumps, steering, front and rear axles fixed seal and the presence of overheating.
        5) Check the rim bolts, and each pin driveshaft bolts loose or fall off.
        6) whether the normal working device.
        7) Check the tire pressure is normal appearance and.
        8) the temperature is below 1 ℃ (near freezing) when the cooling water release, if you have added antifreeze, do not release. (Note: The loader factory not add antifreeze).
        9) inspection equipment and various parts of the shaft sleeve lubrication.
        10) Clean machine appearance and inner bucket of mud and debris.

        Previous  |  Next  |   Return to
        About Us
        Company profile
        Culture
        Organizational
        Development
        Subsidiaries
        Certificates
        Products
        Wheel Loader
        Block Handling Wheel Loader
        Excavator
        Other
        Spare Parts
        News
        Company News
        Trade News
        Exhibitions
        Videos
        Services
        Marketing
        After Services
        Question
        Downloads
        Recruitment
        Talent Concept
        Jobs
        Contact Us
        Feedback
        Contact us
        Copyright 2014- (C) Xiamen Loaders Co., Ltd. All Rights Reserved.
        Two-dimensional [Close]

        點(diǎn)擊這里給我發(fā)消息
        點(diǎn)擊這里給我發(fā)消息